Lead
Agency
|
Timeframe
|
|
1.
Schaad Road
Widen to a four-lane, divided highway with a cross-section
compatible with the recently completed Callahan Drive segment
and proposed improvements to Ball Camp Pike—Ball Road alignment
(see page 17).
|
City/Knox
Co.
|
5
Year
|
|
2.
Murray Road from Pleasant Ridge to Clinton Highway
The existing road cannot support additional development.
|
TPO
LR Plan
|
15
Year
|
|
3.
Clinton Highway
Continue general improvements - adding curbs, sidewalks, crosswalks,
nontraversable medians
and street trees where needed.
|
TDOT
|
15
Year
|
|
4.
Ball Camp Pike-Ball Road realignment
This new roadway will be located between the existing Ball
Camp Pike and Ball Road, aligned with Schaad Road. Improvements
to the Schaad Road intersection on Oak Ridge Highway (which is
a TDOT project) should be consistent with Knox County’s planned
design for Ball Camp Pike-Ball Road.
|
Knox
Co.
|
5
Year
|
|
5.
Western Avenue/Oak Ridge Highway
Planned improvements include four travel lanes, a center turn
lane, sidewalks and bicycle lanes.
Extensive streetscaping should be done in accordance with the
Knoxville Street Tree Master Plan.
|
TDOT
|
5
Year
|
|
6.
Pleasant Ridge Road
Improve to three lanes with sidewalk and greenway: 5 ft sidewalk
on one side, 8 ft separated path on the other side.
|
TDOT/City
|
5
Year
|
|
7.
Bradshaw Road
Will have sidewalks as part of the road improvement that is
under construction now, as well as the
proposed extension. Extend improvement to the east along Ball
Camp Pike as two lanes with bike lane and center turn lanes at
intersections as warranted.
|
City
|
5
Year
|
|
8.
Tillery Road from Clinton Highway to Central Avenue
Widen Tillery and improve intersection with Gap Road.
|
City
|
15
Year
|
|
9.
Improve Jackson Road and Cecil Johnson Road
Investigate a major improvement along portions of the existing
right-of-way, as a Weisgarber extension to aid north-south traffic
flow.
|
City
|
15
Year
|
|
10.
Midpark Road extension to Henson.
This project, when completed, will offer improved north-south
connection.
|
City
|
5
Year
|
|
11.
Improve Knott Road and the Knott Road/Middlebrook Pike intersection
Trucks have trouble navigating the intersection.
|
City
|
5
Year
|
|
12.
Lonas Drive
Traffic controls, including all-way stop signs where warranted
(currently none are warranted, investigate periodically).
|
City
|
5
Year
|
|
Drainage
and shoulder improvements, including sidewalk.
|
City
|
15
Year
|
|
13.
Hollywood ‘intersection and street improvements’
Reduce width of lanes, improve sidewalks and use additional
signage and design methods to enforce the designating trucking
route (more detailed information can be found in the Bearden Village
Opportunities Plan).
|
City
|
5
Year
|
|
14.
Papermill Drive
Improvements to the intersection with Hollywood, including
turn lanes.
|
City
|
5
Year
|
|
15.
Vanosdale Road
Identify what alternatives are available for solving long-term
congestion/capacity problems.
|
City
|
5
Year
|
|
16.
Interstate improvements
Complete work with minimal impact to the adjacent neighborhoods
and achieve best landscaping alternative.
|
TDOT
|
5
Year
|